CIVIL WORKS

We participated in numerous projects and of infrastructure, supplying high-strength concrete and latest generation asphalts.

Present in practically all infrastructures carried out at a national level.

Thanks to the range of products in this sector and the installed production capability, Calcinor participates in the majority of infrastructure projects that take place at a national level.

In general for major civil works Calcinor supplies the necessary materials, high-speed railway lines, retaining dikes, waste water treatment, bus stations and bridges,

Some examples of these civil works:

FIFTH DONOSTIA BRIDGE

Location: Donostia.
Completion date: 2010
Supplies made: Concrete and pumping station.
Detail: Suppliesdhigh strength concrete.

URUMEA MOTORWAY ROUNDABOUT

Location: Hernani.
Completion date: 2009
Supplies made: Aggregate, concrete and pumping station.
Detail: Elevated roundabout made with prestressed concrete.

BASQUE HIGH-SPEED RAILWAY LINE

Location: Urnieta/Hernani.
Completion date: 2014
Supplies made: Aggregate, concrete and pumping station.
Detail: Tunnel of 2,300 m. Concrete supplied for first covering (gunite), lining, slabs and pavement.

BILBAO AIRPORT

Location: Bilbao.
Completion date: February 2009
Supplies made: Asphalt.
Detail: Runway 12-30 reinforcement.

CAPACITY IMPROVEMENT OF BI-631

Location: Derio N-637.
Completion date: June 2010
Supplies made: Asphalt.
Detail: Improved capacity of BI-631.

ARRASATE TURNOFF ROAD

Location: Arrasate.
Completion date: July 2010
Supplies made: Asphalt.
Detail: Arrasate Turnoff (Gipuzkoa).

SOUTH METROPOLITAN TURNOFF ROAD

Location: Bilbao.
Completion date: September 2011
Supplies made: Asphalt.
Detail: South Metropolitan Turnoff Road (Trapagaran-Bizkaia).

RAILWAY LINE MODIFICATION

Location: Lasarte.
Completion date: March 2013
Detail: Railway Line Modification – ETS (Donostia-Gizpuzkoa).

TMB PLANT BILBAO

Location: Bilbao.
Completion date: December 2013
Detail: TMB Plant Bilbao (Bilbao-Bizkaia).

HIGH-SPEED TRAIN

Location: Bergara.
Completion date: October 2015
Detail: High-speed Train (Bergara-Gipuzkoa).

PARQUE LA BENEDICTA

Location: Portugalete.
Completion date: July 2012
Detail: Residential area Parque la Benedicta (Portugalete-Bizkaia).

SOUTH METROPOLITAN TURNOFF ROAD

Location: Trapaga.
Completion date: September 2011
Detail: South Metropolitan Turnoff Road (Trapagaran-Bizkaia).

ENGUERA WIND FARM

Location: Enguera Wind Farm (Valencia).
Completion date: 2009
Supplies made: Concrete.
Detail: Performance of concrete foundation for wind turbines.

A-23 MOTORWAY CASTELLÓN

Location: A-23 Motorway (Castellón).
Completion date: 2007
Supplies made: Concrete.
Detail: Jersey barrier, structures, hard-shoulders and panels.

CHANELLING OF BARRNACO DE FRAGA

Location: Chanelling of Barranco de Fraga – Castellón.
Completion date: 2011
Supplies made: Concrete.
Detail: Lower slabs, walls, upper slabs.

RESTORATION OF ALGAR BRIDGE

Location: Restoration Algar del Palancia bridge – Castellón.
Completion date: 2014
Supplies made: Self-compacting concrete.
Detail: Restoration of the bridge.

WATER TRAP VERA-PALMARET

Location: Water trap Vera-Palmaret (Valencia).
Completion date: 2013
Supplies made: Concrete.
Detail: Lower slabs, walls, upper slabs.

DOCK INNER HARBOUR 2 SAGUNTO PORT

Location: Dock inner harbour 2 – Sagunto Port.
Completion date: 2011
Supplies made: Concrete.
Detail: Dock and capping beam.